House plans, drafting and site planning in San Antonio
Get the house and the lot to agree with each other on paper, where changes are cheap.
We draft house plans and site plans for Hill Country lots around San Antonio. A site plan places the house, driveway, septic field, well and trees around setbacks, slope and drainage. Floor plans and elevations follow, drawn to the HOA and code rules for your area, ready to price and permit.
Who this is for
- You have a lot and a list of rooms, but no plans yet.
- You found a plan you like and need it adapted to your lot and your HOA.
- You are deciding between two lots and want to know what fits on each.
What's included
- Site plan: house pad, driveway, setbacks, septic field, well and drainage
- Tree survey notes so the oaks worth keeping stay standing
- Floor plans and exterior elevations
- Drawings prepared for HOA or architectural review
- Permit-ready sets, coordinated with engineers where required
What it costs
Design and drafting are priced by scope. If we go on to build the house, we tell you upfront how design fees are handled.
Septic fields and wells come before the floor plan
On lots without city sewer, a septic system (an OSSF in Texas permitting language) needs a site and soil evaluation and a permitted design before construction. In Comal County that runs through the county's OSSF office; in Bexar County every OSSF must be permitted. The septic field takes up real space and has setback rules of its own, so it gets placed first.
In north Bexar County, new wells are registered with the Trinity Glen Rose Groundwater Conservation District. Where the well can go, relative to the septic field, shapes the rest of the site.
Keeping the oaks you bought the lot for
Live oaks are a big part of why people buy Hill Country lots. Construction is also one of the main ways they get hurt. Texas A&M Forest Service advises avoiding wounds to oaks from February through June and painting any wound right away, because oak wilt spreads through fresh cuts. We mark root zones on the site plan and keep equipment out of them.
How a build runs, start to finish
Stage 1
Walk the land
Before any drawing, we walk your lot with you: the slope, the rock showing at the surface, the oaks worth keeping and where the sun sets.
Stage 2
Stake it out
The survey goes in. The house pad, driveway, septic field and well get placed around setbacks and trees, and the permits and reviews get filed.
Stage 3
Pour the slab
Footings are dug or drilled into the caliche, the forms set and the foundation poured to the engineer's design for your soil.
Stage 4
Frame it
Walls, roof trusses and openings go up. This is the week the house suddenly looks like a house, and you start rearranging furniture in your head.
Stage 5
Stone and steel
Limestone goes on the walls and the standing-seam roof goes on top. Windows in, weather out, and the trades get to work inside.
Stage 6
Turn the porch light on
Finishes, final inspections and a walkthrough together. Then the keys, and the first evening on the porch.
House plans and site planning: common questions
Do I need a site plan to build in the Hill Country?
In practice, yes. Permits, septic designs and HOA reviews all need to know where the house, driveway and utilities go. A good site plan also protects trees and keeps drainage away from the house.
Can you adapt a stock house plan to my lot?
Yes. We can adjust a plan you like for your lot's slope, orientation and setbacks, and for your HOA's rules.
Do lots over the Edwards Aquifer need extra approvals?
They can. TCEQ says new single-family construction on the Edwards Aquifer recharge or contributing zones may require an Edwards Aquifer application. We check where your lot sits early in planning.
Other work we do
Bring us your lot.
Tell us where the land is and roughly what you want to build. We will tell you what we see and what we need to give you a real price.